You are using an unsupported browser. Please update your browser to the latest version on or before July 31, 2020.
close
Home > Dust Boots > Tube Bundles Assembly > Tube Bundle for Onefinity Z16
Tube Bundle for Onefinity Z16
print icon

All tube bundles are made of 6 components. 

  1. The Boot (V2 or V3)
  2. PwnCNC Extension Adapters - A simple screw-together 90 or 45deg adapter.
  3. The Tube - See-through vertical tube to reposition the hose intake at the top-rear of your X/Z Carriage.
  4. Z-Independent Bracket systems - Customized to fit a variety of machines, this bracketing system mounts onto your machine and provides the z-independent boot a vertical track for mounting onto.
  5. Ultimate Hose Clamps - Highly modular hose mounting system that has a variety of attachments to the machine, reaching out to hold the hose or in this case our Tube.
  6. Maglock Round Adapter (instructions included here)

 

Here are pictures of how your Z16 Onefinity Tube Bundle is assembled:

 

Simplified overall view

 

 

 

Assembling the Stepper base, Arm and Drop Arm (may differ based on with chains or without), and Tube clamp

 

Slide the Stepper Base and Arm together, and fasten them with the previously installed square nuts and M5 screws. 

Insert the square nut into the arm and Snap it to the upper drop arm. 

 

Secure the drop arm to the arm with the drop arm with the screws. 

Install the square nut, and then put the attachment on. 

 

 

 

The Tube, Maglock Adapter, and Extension Adapter Assembly (Your exact configuration may differ)

 

Installing the stepper base 

 

Completed Overall View

 

 

Feedback
0 out of 0 found this helpful

Attachments

v3.pdf v2.pdf
scroll to top icon